Analytical Products Group  
Home |  Help |  View Cart  | My Account  | Login 
Search APGQA.com 
   English   Simplified Chinese   French   German   Spanish  
Translation by SYSTRANLinks - Disclaimer
 
 

Please forward APG eNews to your friends and coworkers, or they can sign-up at www.apgqa.com/newsletter_add.asp.

Follow the instructions at the end of this message to unsubscribe.




Creating a System for Control Charting
Control Charting supplies a method for identifying abnormal or trending data that requires intervention before a failure occurs. This methodology can also satisfy requirements for expression of uncertainty, such as those in NELAC chapter five on Quality Systems (NELAC 2003, 5.5.4.1). This month's Technical Article details the collection, arrangement, and review of data based on Quality Control samples as a way for laboratories to manage a proactive Quality System.

Read the complete article
[http://www.apgqa.com/newsletters/7_2006_control.asp]

[ back to top ]

The Importance of Quality Control Materials During Sample Analysis
Two essential elements necessary for a laboratory to produce defensible and unquestionable data are accuracy and precision. With the proper use of quality control materials, the main objectives of a laboratory can be achieved with confidence.

Read the Complete Article
[http://www.apgqa.com/newsletters/7_2006_qc.asp]

[ back to top ]


Time is Running Out for DMR-QA
The July WP and DMR-QA specific studies are the only studies available to fulfill DMR-QA requirements. The August WP is not in the time period allotted for DMR-QA requirements. APG is still shipping DMR-QA samples everyday and the results from the studies can be reported online until 11:59 PM EST on September 1st. There is still time. Order online or call us to place an order TODAY.

Place a DMR-QA Order
[http://www.apgqa.com/dmrqa]

[ back to top ]


Win a Pizza Party for Your Lab
By reporting your DMR-QA data online, you have a chance to win your lab a pizza party, which is a nice reward for a successful DMR-QA. Everyone who enters data online is registered to win.

[ back to top ]


2006 Salary Survey: The Numbers Game
[First published in July/August 2006 issue of Environmental Protection Magazine. Reprinted with permission by 1105 Media, Inc. © 2006 by 1105 Media, Inc. All Rights Reserved.]
Article By Angela Neville, JD, REM, and Jason Goodman

"No doubt these days many of you environmental professionals feel that the odds of boosting your salaries are about as uncertain as playing the lottery. Just like the numbers game in gambling, betting your future on a particular career path can be risky when it's so hard to predict how events in the days ahead will impact your profession."

Read the complete article

[ back to top ]

 

NVLAP

ISO Certified

For questions or comments, please send an email to support@apgqa.com. Send recommendations for future APG eNewsletter topics to enews@apgqa.com.

Email addresses are taken from APG customer lists or public information. Analytical Products Group, Inc. does not share your information with third parties unless required by law. Read the APGQA.com Privacy Policy

Email Subscription Information
Email Address: {EmailAddress}
If this email reached you in error or you would prefer not to receive information from APG please accept our sincere apologies and follow this link to unsubscribe.
2006 Analytical Products Group, Inc.
Email  support@apgqa.com
Phone  800.272.4442 - Belpre
   440.899.9452 - Cleveland
Fax  740.423.5588

 

bad




  IN THIS ISSUE

Creating a System for Control Charting

 
  The Importance of Quality Control Materials During Sample Analysis
     
  Time is Running Out for DMR-QA
     
  Win a Pizza Party for Your Lab
     
  2006 Salary Survey: The Numbers Game

  Contact APG
Email  support@apgqa.com
Phone  800.272.4442
   740.423.4200
Fax  740.423.5588
 

  Current Studies
APG operates NVLAP accredited monthly Wastewater (WP) Proficiency Testing Studies, bi-monthly Drinking Water (WS) studies, and quarterly Soils studies.
 
DMRQA Ships Closes
Jul WP 7/5/06 8/18/06
DMRQA Specific 6/1/06 9/1/06
         
WP   Ships   Closes
Jul WP   7/5/06   8/18/06
Aug WP 8/1/06 9/14/06
Sept WP 9/4/06 10/18/06
 
WS Ships Closes
Jul WS 7/17/06 8/30/06
Sept WS 9/18/06 11/1/06
 
Soils Ships Closes
Jul Soils 7/24/06 9/6/06
Oct Soils 10/23/06 12/6/06
 
** All Plate Count Microbiological samples are shipped overnight for Tuesday delivery and MUST be analyzed on the Wednesday following shipment.
 
   

  Find a Product
Search for APG Products by Program, Analyte, or Catalog Number.
 
   

  Order Products
Add products to your shopping cart, schedule shipments, and place your order.
 
   
  Track Your Order
With your APGQA.com Elite Account, you can determine when your APG shipment will arrive, schedule shipments to ensure your accreditations, and review previous orders.
 
   

  NELAC Method Locator
Are you looking for a NELAC Method Code? Use this online tool to find NELAC methods by analyte, category, reference, or type.
 
   

  Certifying Officers
Need to contact your Drinking Water or Wastewater Certifying Officer? Find their email address, mailing address, phone number, and fax number.
 
   

  DMRQA Coordinators
Find their contact information - email address, mailing address, telephone number, and fax number.