|
Please forward APG eNews to your
friends and coworkers, or they can sign-up
at
www.apgqa.com/newsletter_add.asp.
Follow the instructions at the end of
this message to unsubscribe.

GC Health
Diagnosing Instrument Issues
Monitoring and maintaining peak performance of GC's and GC/MS's is
essential. This informative article discusses the steps to
identifying and resolving common GC issues. Leak detection,
base line drift, oven maintenance and inlet checking are discussed.
Read the complete article
[http://www.apgqa.com/newsletters/8_2004_gc.asp]
[
back to top
]

Less Than Reporting
How should I report data for an analyte that is not detected in a proficiency
testing sample? Non-detects are often the source of
confusion when reporting PT data. This article provides explanations
of non-detects, false positives and less than reporting.
Read the complete article
[http://www.apgqa.com/newsletters/8_2004_less_than.asp]
[
back to top
]

Online Data Reporting Tutorial
This tutorial
details the convenient data entry and reporting
options that you have when
you submit your results online at APGQA.com.
View the Online Data Reporting Tutorial
[http://www.apgqa.com/tutorial/data_reporting]
[
back to top
]
Laboratory of Excellence Certificate
Laboratories that pass 100% of the analytes that they report in a PT Study
are awarded a Laboratory of Excellence Certificate. If your lab has been
awarded a Laboratory of Excellence Certificate and would like to display
the logo on your website, please send us an email at
excellence@apgqa.com.
Learn more about the Laboratory of Excellence
[http://www.apgqa.com/loe]
[
back to top
]

The DMRQA Deadline is Here
DMRQA Study 24 Ends September 3, 2004
This is the final week for DMRQA 24. All data is due to APG by
11:59:59 PM Eastern Time on September 3, 2004. Remember that
the APGQA.com data entry system is available 24 hours per day.
Please give us a
call or send us an email
if you have any DMRQA reporting questions.
View the DMRQA Permittee Data Entry Tutorial
[http://www.apgqa.com/tutorial/permittee]
Locate your DMRQA Coordinator
[http://www.apgqa.com/coordinators.asp]
[
back to top
]

All Section Wastewater Analyst Workshop
Friday September 17, 2004
The Ohio Water Environment Association (OWEA) will be holding the All Section Wastewater
Analyst Workshop on Friday September 17 at the University Plaza Hotel in Columbus,
Ohio. The one day technical program includes many topics of interest.
Please stop by APG's booth and say hello.
View OWEA's website for more information
[http://www.ohiowater.org/owea/for_the_lab/laball.htm]
[
back to top
]
Municipal Laboratory Training and Software
APG has been informed of a vendor, Maximum Advantage, that supplies training and software designed
specifically for municipal laboratories. Maximum Advantage's software, MAAP, is a municipal laboratory information
management and quality assurance development program. Maximum advantage will also be offering three two-day seminars in September.
Learn more about Maximum Advantage's software and training
[http://www.apgqa.com/newsletters/8_2004_alloway.asp]
[
back to top
]
For questions or comments, please send an email to
support@apgqa.com. Send recommendations for future
APG eNewsletter
topics to
enews@apgqa.com.
Email addresses are taken from APG customer lists or public information.
Analytical Products Group, Inc. does not share
your information with third
parties unless required by law.
Read the APGQA.com Privacy Policy
Email Subscription Information
Email Address: {{E-mail Address}}
If this email reached you in error or you would prefer not to receive
information from APG please accept our sincere apologies and
Follow this link to unsubscribe
.
| {{ML_Year}} Analytical Products Group, Inc. |
| Email |
support@apgqa.com |
| Phone |
800.272.4442 |
| |
740.423.4200 |
| Fax |
740.423.5588 |
|